CONTACT US

Contact Us

Selection consulting · Quotations · Technical support · Spare parts

  • +86Country code
  • 2 hrsBusiness-day response
  • WorldwideExport service

Sales Hotline

+86 180 8669 3390

International calls welcome — dial China country code +86

Email

alzn66@foxmail.com

Technical documents, test reports and commercial correspondence by email

Head Office

No.10 Ziguang Road, National High-tech Industrial Development Zone, Xianning, Hubei, China

Production plant inside the Xianning National High-tech Industrial Development Zone

Business Hours

Mon – Sun, 8:00 – 20:00 (GMT+8)

Outside hours, leave a message — we reply first thing the next business day

CONTACT US

Tell Us Your Duty Conditions
We Will Propose the Right Configuration

Whether it is a new pump station, a retrofit of an old one, stormwater separation or network interception — provide flow, head, media and installation space, and our engineers will come back with a targeted equipment proposal.

  • Free selection advice with civil-interface requirements
  • Custom and non-standard designs from your drawings
  • Worldwide installation guidance and commissioning support
  • Full-unit warranty with responsive after-sales
Sales Hotline +86 180 8669 3390

Your details are used only for this selection consultation. We respond within 2 business hours.

MAPLOCATION

Plant & Transportation

  • Head OfficeNo.10 Ziguang Road, National High-tech Industrial Development Zone, Xianning, Hubei, China
  • Production PlantXianning National High-tech Industrial Development Zone, Hubei
  • RegionXianning — the "Southern Gateway of Hubei", adjacent to Wuhan with convenient transport
  • VisitingTo tour the plant and equipment in production, please book by phone in advance

For navigation, search "Zhongzhuo Intelligent Fluid Equipment (Hubei) Co., Ltd." in your maps app.

FAQBEFORE CONTACT

You May Want to Know

  • How long does a prefabricated pump station last?

    A quality FRP cylinder with a stainless-steel liner typically lasts more than 30 years under normal maintenance. Wear parts such as submersible pumps usually need replacement every 3–5 years depending on duty and care.

  • Can a prefabricated pump station be installed in high-groundwater areas?

    Yes. Prefabricated stations seal exceptionally well and use submersible sewage pumps, so the buoyancy issues of conventional stations do not arise. The excavation still needs dewatering per the geology and proper anti-flotation design.

  • Does the control system support remote access?

    Modern smart pump stations include an IoT module for remote monitoring and control via mobile APP or web console — status, current, voltage, water level and fault codes are all viewable at any time.

  • How long does installation take?

    Far shorter than conventional stations. With the foundation ready, from lifting to completed pipe connection usually takes only 1–2 days, depending on project complexity.

  • When is a standby pump necessary?

    For critical, continuously running stations we recommend one standby pump so service continues if a duty pump fails. For non-critical or intermittent duties, decide on an economic analysis.

  • How can I judge pump-station quality before purchase?

    Check the cylinder wall thickness and material (e.g. resin content of the FRP), the smoothness of the liner and the stability of the control system. Ask the manufacturer for material test reports and visit reference projects.